‘The momentum continues’: Community gathers for update on ‘wonder’-inspiring new Prince Edward County hospital build

From a 24/7 emergency department to 23 inpatient beds inside the first exposed mass timber hospital in North America, community members recently heard more about the new hospital being built in Prince Edward County (PEC).
Quinte Health said about 90 community members joined a virtual meeting for an update about the construction of the Prince Edward County Memorial Hospital (PECMH).
“The momentum continues,” noted Quinte Health in a social media post that followed the meeting.
The project has now reached the midpoint of construction, with all foundations complete and approximately 90 per cent of the primary structure in place, community members learned.
During the session, Quinte Health president and CEO Stacey Daub commented on the progress of the construction and the strength of the relationships being built as well.
“When I stand inside the walls of new hospital and I look around, I think the word that comes to mind to me is wonder,” Daub said during the town hall-style meeting that was broadcast on YouTube.
“It’s such a great example of human will and capacity to build something so unique, and so beautiful, and so reflective of the community that we all know and live in.”
As the first unencapsulated mass timber hospital in North America, PECMH will also encompass sustainable features such as geothermal heating and cooling, and green roofs.
The hospital is being built through the collaboration of the provincial government, Quinte Health, the PECMH Foundation, PECMH Auxiliary, the Prince Edward Family Health Team, the municipality, and the community of PEC.
“Every partner, from our medical professionals to the dedicated supporters who have given so generously, is contributing to the future of healthcare in our area,” Quinte Health noted.
“This project is incredibly meaningful — not just for Quinte Health, but for the entire PEC community,” Daub said in a statement.
“We’re building something truly special here — a modern, patient-focused hospital designed for the people who live, work, and visit this incredible part of Ontario.”
Once complete, the new hospital will be “a leading-edge health care facility designed to meet the current and future capacity needs of the local community,” Quinte Health stated.
“It will be the most significant change to our local health care system since the first county hospital opened in 1919.”
The PECMH will feature:
- -23 inpatient beds
- -A 24/7 emergency department
- -An acute inpatient unit supported by physicians within the Prince Edward Family Health Team
- -An inpatient pharmacy
- -A satellite hemodialysis unit
- -Ambulatory care, including clinics, medical day care, endoscopy, and medical device reprocessing
- -A siagnostic imaging including CT scanner, x-ray, ultrasound, mammography, and cardio-diagnostics
- -A point of care laboratory
- -“Efficient” access to other Quinte Health hospitals, secondary care in Belleville and tertiary care in Kingston
- -A new helipad
To watch the video, follow this link: PECMH Build Virtual Community Update – May 2026
