MunicipalNewsQuinteist

North vs. south? Belleville city councillors grapple with proposed high-speed train routes

Artist’s rendering of Alto’s high-speed train in the Canadian wilderness in winter, courtesy of Alto.

Belleville city councillors don’t appear in any rush to back Centre Hastings’s request to support a High Speed Rail (HSR) stop in the Madoc-area.

Centre Hastings is lobbying Alto, the Crown Corporation tasked with building a passenger rail service reaching speeds up to 300 km/h, to add a future HSR train station in the area of Highway 7 and Highway 62.
The northern township is asking regional municipalities such as Belleville to get on board with its lobbying campaign.

However, the request appeared to get a lukewarm response from some Belleville councillors when it appeared on their Monday, Feb. 9, 2026 agenda.

City council voted to receive the letter, but did not take any action at this time to pass a matching resolution or letter of support calling on the federal and Ontario governments to “ensure current corridor planning preserves a station-ready envelope in the Madoc area.”

“I struggle to offer my support to the Madoc proposal as written,” said Councillor Kathryn Ann Brown, one of the City’s two elected representatives from Thurlow Ward (Ward 2).

Brown questioned the lack of specifics in Centre Hasting’s letter that claimed a HSR train stop in the Madoc-area would offer “tangible benefits to neighbouring municipalities.”

“It frames it in such a way as to regional benefits without actually being able to put anything firm around what those regional benefits might actually be,” she explained.

Alto map showing proposed HSR corridors north of Belleville

Centre Hastings Mayor Tom Deline did outline some general economic benefits of a Madoc-area train stop, including: tourism growth by making eastern Ontario communities easier to reach for visitors without cars; improved access to employment markets, post-secondary institutions, health services, and government services in Ottawa, Toronto and Montréal; and, reduced dependence on long-distance driving, supporting climate objectives and improving transportation safety.

Belleville Chief Administrative Officer Matt Macdonald confirmed the City has had no direct staff consultation with Centre Hastings since its resolution was passed last month.

However, Councillor Sean Kelly said that based on his previous conversations with Alto officials, the HSR project – a 1,000 kilometre dedicated rail line running between Quebec City and Toronto – will create about 50,000 skilled trades jobs.

“I don’t know if that’s something that we can walk away from that could certainly benefit our area.”

He added: “I am going to put my support behind Centre Hastings on this and support any conversations they may have with the speed train blasting through Centre Hastings.”

Centre Hastings is currently not listed as a passenger stop on the multi-billion dollar HSR line, though the municipality wants to position itself should Alto decide to create new stops in the future.

Another wrinkle in Belleville’s fast-track debate has to do with where the HSR tracks would be built in eastern Ontario.

Alto is currently holding public consultations on two potential corridors – a northern route that would follow a more straight line near the Highway 7 corridor between Ottawa and Peterborough, and a southern route that would dip closer to cities like Belleville and Kingston.

Coun. Garnet Thompson said council should steer clear of taking a position on either of the proposed HSR corridors.

“I don’t think we should get involved in either one of them.”

Brown noted the proposed southern route would cut through Belleville’s Thurlow Ward, but with no indication of a train stop.

She put forward a Notice of Motion, to be debated at the next meeting of council on Monday, Feb. 23, for the City of Belleville to formally oppose Alto’s southern route.

Alto’s map indicates the southern HSR route would encompass a wide swath of land about 10 kilometres north of the city centre and could impact communities such as Foxboro, Halloway, Plainfield and Chatterton.
Brown’s proposed motion noted a southern train corridor would create a physical obstacle in Thurlow Ward that would impact Belleville’s “rural character,” including prime agricultural land, Moira watershed and some densely-populated residential areas.

Alto is currently holding consultations in communities that may be impacted by the northern or southern HSR line, including March 5 at the Madoc Township Recreation Centre and March 25 at the Stirling and District Lions Club.

Alto’s consultation will occur twice at each location, from 11 a.m. to 3 p.m. and 5 p.m. to 9 p.m.

Leave a Reply