‘Direct and tangible benefits’: Belleville city councillors asked to support future high-speed train station in Madoc area

Communities in Eastern Ontario are lining up to lobby for passenger access to the federal government’s proposed multi-billion dollar High-Speed Rail (HSR) line with closer routes and future train stations.
Centre Hastings is the latest community that wants a piece of the action, and is urging neighbouring municipalities to get on board with its own lobbying effort to add a future HSR train station in the Madoc area.
“We believe this location offers direct and tangible benefits to neighbouring municipalities, including yours,” wrote Centre Hastings Mayor Tom Deline in a letter to Belleville city council.
The federal government has created Alto as a crown corporation to design, build and operate the 1,000 kilometre long HSR corridor between Quebec City and Toronto with electrified trains reaching speeds of 300 km/h.
Alto has not yet finalized the exact HSR corridor in Eastern Ontario, but is currently studying two possible routes.
The northern route between Ottawa and Toronto would travel in a straighter line close to the Highway 7 corridor.
The southern route would dip further south of Highway 7 and bring the HSR line closer to cities like Brockville, Kingston and Belleville – with an estimated drive time of 15 minutes north of Belleville and 30 minutes north of Kingston and Brockville.


These maps show the two proposed HSR corridors in this region. The coloured dots reflect the locations of public comments.
The agency has not indicated whether it plans to add any new train stations within either corridor, other than the three Ontario stops currently identified in Ottawa, Peterborough and Toronto.
Alto is currently holding public consultations from January to March 2026 to hear input on both proposed routes.
Scheduled consultation dates in Eastern Ontario include March 4 at the Perth Lions Club, March 5 at the Madoc Township Recreation Centre, and March 25 at the Stirling and District Lions Club. Alto’s consultation will occur twice at each location, from 11 a.m. to 3 p.m. and 5 p.m. to 9 p.m.
Centre Hastings is focusing on a future train station along the northern HSR route, located about 40 kilometres north of Belleville, and is asking for support from nearby communities.
“While the initial phase does not include an intermediate station between Peterborough and Ottawa, future expansion is expected to be influenced by ridership potential, regional demand, and corridor planning decisions made in the near term,” stated Deline.
Belleville city councillors were scheduled to discuss the Centre Hastings request for participation and support at their Monday, Jan. 26, 2026 meeting. However, the meeting was cancelled due to inclement weather. Council is expected to discuss the regional advocacy request at its next meeting on Feb. 9.
It remains unclear if Belleville politicians will support Centre Hastings’ request, lobby for the closer southern route, or both.
Centre Hastings council passed a motion that supports a future stop on the HSR line in the Madoc-area around Highway 7 and Highway 62, noting that it is “uniquely positioned as the only location along this corridor where a full provincial highway provides bi-directional north-south access, extending to Belleville, Prince Edward County, Highway 401, and north to Bancroft and Ontario’s cottage-country.”
Deline said municipalities in the Belleville and Quinte region would benefit from a future Alto train station in the Madoc-area, including:
- High-speed rail access within 45-75 minutes for residents and businesses in surrounding municipalities, without requiring travel to Ottawa, Kingston, or the GTA
- Improved access to employment markets, post-secondary institutions, health services, and
government services in Ottawa, Toronto and Montréal - Tourism growth, by making eastern Ontario communities easier to reach for visitors without
cars - Economic development and labour mobility, particularly for employers seeking access to a broader workforce
- Reduced dependence on long-distance driving, supporting climate objectives and improving transportation safety.
“For the Belleville-Quinte West region, a Madoc-area Alto station would function as a strategic option, providing residents and businesses with faster access to Ottawa and Montréal without the need to travel east to Kingston or west toward the GTA. This would strengthen Belleville’s role as a regional aggregation hub and support economic diversification and workforce mobility,” Deline wrote.
Even though Centre Hastings is pushing for a future train stop within its municipality, Deline called it a regional opportunity.
“This initiative is not about competition between municipalities, but about ensuring that our region collectively benefits from a nationally significant infrastructure investment.”
He said neighbouring municipalities should support its regional lobbying effort to help ensure Alto’s planning preserves flexibility for future service expansion, rural and small-town Ontario is not bypassed by high-speed rail investments, and the region is better position to capture economic and mobility efforts when future phases of the HSR line are considered.
